Tested. Documented. Issued with the ground.

Sports-surface paperwork is easy to claim and hard to audit. We specify against published standards, test at handover, and send the current certificate when you request it.

Management systems
ISO 9001 · 14001
Football systems
FIFA-benchmark
Track geometry
World Athletics
System warranty
8 years, written

The chain

Standard, system, then a pack you can file.

Certificates are not a logo strip. They follow a named construction and a tested handover.

  1. 01

    The standard

    Federation benchmarks define what a football pitch, a track or a court is supposed to do. We specify against those numbers.

    • Ball behaviour
    • Player safety
    • Geometry
    • Surface friction
  2. 02

    The system

    ProLane, AcryLayer, ProCourt and PLAYNEX Pro each have a published construction. The certificate follows that build, not a generic brochure.

    • Named product line
    • Published build-up
    • Material declarations
    • Brand specification
  3. 03

    The handover

    OSMS surveys, builds and tests the ground, then issues the documents with the keys. One contract, one pack.

    • In-house crews
    • Layer checks
    • Performance tests
    • Warranty in writing

Standards

Four references. One specification desk.

Numbers below are the checks we write into a system. The exact report for your roll or pour is issued on request.

Football

FIFA-benchmark systems

  • Ball roll
  • Vertical rebound
  • Shock absorption
  • Rotational resistance

Athletics

World Athletics geometry

  • Total-station lanes
  • 13 mm polyurethane
  • Force reduction
  • Even planarity

Courts

Published court systems

  • Acrylic coat stacks
  • Indoor vinyl wear layers
  • Maple sprung floors
  • Line-marking tolerance

Laboratory

Tested, then documented

  • Shock absorption
  • Planarity
  • Heavy-metal screening
  • Written warranty

Documents

The paperwork, on request.

We do not leave certificates as open downloads. Tell us the project and we send the current file.

Request the full pack

On the ground

Checked before it is called finished.

A certificate does not replace the site. These are the checks the crew records between mobilisation and the handover pack.

  1. 01

    Site

    • Levels survey
    • Soil bearing
    • Drainage map
    • Access plan
  2. 02

    Base

    • Compaction lifts
    • Kerb and falls
    • Laser-graded plane
    • Moisture check
  3. 03

    Surface

    • Seam welds
    • Infill calibration
    • Coat thickness
    • Line tolerance
  4. 04

    Handover

    • Ball roll
    • Shock absorption
    • Planarity
    • Documented pack