Sports infrastructure · Engineering · Maintenance
Grounds thatperform for years.
We engineer sports surfaces from the soil up - drainage, sub-base, surface system, lighting and lifecycle care - under one accountable contract, tested and documented at handover.
0+
Grounds delivered
Across schools, clubs and municipalities
0 yrs
Field engineering
Design, build and maintain in-house
0
Cities served
Nationwide install and service network
0 yr
System warranty
Written performance guarantee
- Schools & Universities
- Government & Municipal
- Builders & Developers
- Architects & Consultants
- Sports Clubs & Academies
- Townships & Communities
- Corporate Campuses
- Premium Residential
- Schools & Universities
- Government & Municipal
- Builders & Developers
- Architects & Consultants
- Sports Clubs & Academies
- Townships & Communities
- Corporate Campuses
- Premium Residential
Why it fails, and why ours doesn't
Most sports surfaces fail below the grass.
Water that has nowhere to go, a base compacted in one pass, levels that drift by centimetres. The fibre gets blamed, but the engineering was already lost. We invert that order - soil, water and geometry first.
Engineering before surfacing
Most failures happen below the grass. We start with soil, water and levels - the surface is the last 5% of the job.
One accountable contract
Civil works, drainage, surfacing, fencing and lighting under a single scope. No gaps between vendors to argue over.
Measured, not claimed
Ball roll, shock absorption, planarity and lux are tested and documented at handover. You receive the numbers.
Built for lifecycle
Every project can carry a maintenance contract, so year six performs close to year one instead of quietly degrading.
Soil, water and geometry are surveyed before a fibre is priced.
Capabilities
Every surface a campus needs.
Eight disciplines, one delivery team. Specified individually, sequenced as one programme.
Delivered work
Six recent grounds, in their own words.
Every project below shipped with a documented test report and a maintenance plan.
A similar brief starts with the sport, the plot and the season you need to open.
The engineering process
From first site visit to season six.
- 01
Consultation
We understand usage, user load, budget band and the calendar you need to hit.
- 02
Site survey
Levels, soil bearing, water table and access are recorded and photographed.
- 03
Engineering
Build-up sections, drainage design and system specification with a line-item BOQ.
- 04
Construction
Civil works executed in controlled lifts with quality checks at every layer.
- 05
Installation
Certified crews, welded seams, calibrated infill and precision line marking.
- 06
Handover & care
Performance testing, documentation, training and an optional maintenance contract.
Step one is a site visit. The rest of the programme is written from what we measure.

Materials & technology
Specified to numbers, not adjectives.
Fibre geometry, stitch density, backing construction and infill are chosen against the load your ground will actually take.
- Fibre
- Monofilament PE, diamond spine
- UV rating
- 10,000+ hours stabilised
- Backing
- Dual-layer PP, PU coated
- Drainage
- Up to 60 L/min/m²
- Infill
- Silica, SBR, EPDM or organic
- Testing
- Ball roll · shock · planarity
Client voice
What the people who signed off say.
They rebuilt a ground that had been unusable for two seasons. The drainage engineering was the difference - we now play the day after heavy rain.
Sports Officer
Municipal Corporation
Four surfaces, one live campus, zero disruption to teaching. The phasing plan they proposed was better than the one our consultant drafted.
Head of Operations
International School
The handover pack included every test result. As a consultant that is exactly what I need for sign-off, and it almost never arrives.
Principal Consultant
Architecture Practice
Trust & compliance
Standards you can audit.
Certificates, test reports and warranty documents are issued as part of every handover pack.
Questions
Answers before you ask.

Our own crews. Not a subcontracted chain.
Certified installers Seam-welded joints Calibrated infill Documented QC
Tell us about the ground you need.
Send drawings, a location pin, or just a rough idea. You'll get an engineered response - not a brochure.